1. Home
  2. Get a Quote / Contact
Get a Factory Quote · Reply in 24h

Get Factory Pricing
Engineer replies within 24 hours

Fill in the inquiry form below — state your application, target market and capacity needs clearly,your first reply will be a spec sheet + factory price— not small talk.

Why Direct With Us

Deal Directly With the Source Factory

For the same 1MWh project, traders add 25–40% in middleman costs — we cut that layer out.

  • ✓ 24-Hour Response: a reply within 24 business hours, simple questions answered the same day
  • ✓ Direct Access to Engineers: no support scripts — engineers discuss specs with you
  • ✓ Multilingual Support: Chinese / English / Russian / Spanish / Arabic
  • ✓ 10-Year Warranty · 10+ Certifications: IEC 62619 / UL 1973 / UN38.3 / CE, matched to your market
  • ✓ Strict Confidentiality: never shared with third parties, no marketing spam

Factory

Huizhou, China · 12,000㎡ Production Base

📋 Inquiry Form

Only name + WhatsApp - reply within 24 h
Model of Interest: Change
From article:— requirements pre-filled for you
System Map

Understand the BESS System Layout (Optional)

This is a complete BESS application ecosystem: solar, residential / industrial / commercial loads, EV charging stations and grid interconnection.Click a blue dot to jump to the related topic; when done, return to the form above and leave your requirements.

Seven BESS components at a glance: solar / residential / industrial / commercial / EV charging / grid / battery storage
Solar PV

Solar PV

A PV array converts sunlight into DC power. Surplus daytime power is automatically stored in the BESS,Raise self-consumption from 30% to 80%。

Read the Guide →
Village / Residential

Residential Loads

Villas, islands and areas with frequent nighttime outages. With 5–30kWh stacked modules,seamless switchover during outagesand 12h+ backup.

Read the Guide →
Grid Connection

Grid Interconnection

Export to grid (VPP / frequency regulation), valley-charge peak-discharge arbitrage, seamless automatic island switching <20ms on outage.

Read the Guide →
Industrial Load

Industrial Loads

Factories, mines, oilfields, data centers. 100kWh–8MWh peak shaving,demand charges cut by 30%, 4-year payback.

Read the Guide →
BESS Energy Storage

Battery Energy Storage System

The core of the whole diagram: cells + BMS + PCS + EMS + fire suppression + thermal management + container. HYSPERIX builds complete systems, from 5kWh to 35kWh across the full capacity range.

Read the BESS Guide →
EV Charging Station

EV Charging Station

Ultra-fast stations with BESS:save transformer upgrade fees, cut demand charges, off-grid emergency charging. 1MWh + four 360kW chargers is a typical setup.

Read the Guide →
Commercial Load

Commercial Loads

Malls, hotels, offices, hospitals, schools. 100–500kWh peak shaving + backup + ESG reporting benefits.4–6 year payback。

Read the Guide →

💡 Hover overblue dotsfor component details · click a dot to open the topic article · then leave your details in the form above

Numbers

Work With HYSPERIX — the Numbers Speak

15%

Lower Unit Price

Direct from factory, no middleman markup. Choose from FOB / CIF / EXW terms.

45 Days

Lead Time

Standard products ship in 30 days, OEM / ODM custom in 45–60 days. FCL sea / air / land shipping available.

10 Years

Warranty

10-year full-system warranty, 6,000+ cell cycles. Overseas customers get spares shipped first, faulty units returned later.

10+ Certificates

Mainstream Certifications

ISO 9001 / IEC 62619 / UL 1973 / CE-EMC / UN38.3 / CB / TüV, matched to your market.

Unsure about capacity? Send us your bill

Send 12 months of bills or usage data — free analysis of installable capacity, annual savings and payback. If it doesn't add up, we'll tell you.